STEEL DOOR SOLUTIONS FOR
DEMANDING BUILDINGS
YEAR OF PROJECT CONCLUSION 2020
LOCATION CARDIFF, WALES
TOTAL AREA 750m²
Space2B – The Maltings
Space2B at The Maltings is a dynamic business hub nestled in the heart of Cardiff. Architecture by Davies Llewellyn & Jones.
YEAR OF PROJECT CONCLUSION 2017 – 2019
LOCATION CLONEE, CO. MEATH, IRELAND.
TOTAL AREA 97,000m²
Facebook data centre – Clonee
Data centre campus and office suite. Architecture by NWA plc.
YEAR OF PROJECT CONCLUSION 2018
LOCATION CRAWLEY, UK
TOTAL AREA 10,140m²
DLR – LGW16 Crawley
Two data hall buildings, emergency power building and a business hub office with a ground floor café. Architecture by NWA plc.
YEAR OF PROJECT CONCLUSION PHASE 2 – 2022
LOCATION CARDIFF, WALES
TOTAL AREA 2,300m²
Lock n Store
We were approached to design & manufacture a range of brand new fire and bathroom doorsets for this titan of UK storage. Approximately 26 new doorsets were installed to provide fire protection and prevention to the highest possible standard.
YEAR OF PROJECT CONCLUSION 2017-2018
LOCATION ODENSE, DENMARK
TOTAL AREA 97,000m²
Facebook data centre – Odense
Data centre and administration suite. Architecture by NWA plc.
YEAR OF PROJECT CONCLUSION PHASE 1 – 2015
LOCATION CRAWLEY, UK
TOTAL AREA 11,000m²
DLR – Merlin
Large data centre scheme for an end user. The overall design was for 2 buildings, achieving a total power load of 24MW within 10,800m². Architecture by NWA plc.
COMPLIANCE & ACCREDITATIONS
All our doors are frequently tested and certified to meet a range of internationally recognised standards, including Certifire, LPCB and CE marking.